United Contractors for Oil & Gas UCOG) has all necessary tools and equipment to check, to prepare to pressure test and to recondition the down-hole completion equipment as per Client request

Work Shop Equipment:

• Make-up and break-down facilities (with special tong for 13% Cr equipment )for completion sub-assemblies

• Torque indicator for L80 equipment and Torque indicator with recording of torque and turns (computer system) for 13% Cr equipment.

• Testing facilities for hydraulic pressure test at 5000psi

Completion Specialists:

United Contractors for Oil & Gas has very experienced completion specialists of more than 15 years experience. They are able to prepare and to run all the types of completions including in horizontal wells.

The experience of completion personnel permits to run and pressure test the completion safely and with the minimum time.